Nuclear Energy Construction Programme UK 2008-2018

Published by AMA Research Contact us : +1-860-674-8796
Published 2008/07 Content info 70 pages
Product code AH70541
Price From  US $ 1250 Order/Price list
US $ 1250 Hard Copy
US $ 1250 PDF by E-mail (Single User License)
Delivery Time
PDF by E-Mail
Approx. 1-2 business days
Hard Copy/CD-ROM
Approx. 3-4 business days
If you need expedited delivery, please call us.
Description TOC

Table of Contents

1. INTRODUCTION

2. EXECUTIVE SUMMARY AND FUTURE PROSPECTS

3. THE NUCLEAR POWER MARKET IN THE UK

  • 3.1 HISTORY OF NUCLEAR POWER PROVISION IN THE UK
  • 3.2 CURRENT NUCLEAR POWER PROVISION
  • 3.3 CURRENT ENERGY SUPPLIES IN THE UK
  • 3.4 THE FUTURE OF NUCLEAR POWER
  • 3.5 DECOMMISSIONING AND NUCLEAR WASTE PROGRAMME
    • 3.5.1 Nuclear Decommissioning Authority (NDA)
    • 3.5.2 Future of Decommissioning in the UK

4. NUCLEAR POWER STATION BUILD PROGRAMME

  • 4.1 BACKGROUND TO THE PROGRAMME
  • 4.2 GOVERNMENT ENERGY STRATEGY AND THE NEED FOR NEW REACTORS
    • 4.2.1 Energy Needs
    • 4.2.2 Closure of Coal-fired Plants
    • 4.2.3 Climate Change and Carbon Emissions
    • 4.2.4 Security & Availability of Future Energy Supplies
  • 4.3 ESTIMATED TIMETABLE FOR THE PROGRAMME
  • 4.4 KEY PLAYERS INVOLVED IN THE PROGRAMME
    • 4.4.1 AREVA
    • 4.4.2 Atomic Energy of Canada Ltd (AECL)
    • 4.4.3 BNFL
    • 4.4.4 British Energy
    • 4.4.5 EDF Group
    • 4.4.6 E.ON.
    • 4.4.7 General Electric
    • 4.4.8 UKAEA
    • 4.4.9 Westinghouse
  • 4.5 ESTIMATED COSTS OF THE PROGRAMME
    • 4.5.1 Capital and Operating Costs

5. FACTORS AFFECTING THE NUCLEAR POWER MARKET

  • 5.1 PLANNING
    • 5.1.1 Available Land & Sites for New Reactors
    • 5.1.2 Planning Delays
  • 5.2 LEGISLATIVE DRIVERS
    • 5.2.1 Nuclear Power White Paper
  • 5.3 SKILL SHORTAGES
  • 5.4 PROCUREMENT ISSUES
  • 5.5 MAJOR CONCERNS SURROUNDING THE NEW BUILD PROGRAMME
    • 5.5.1 Risk of Accident
    • 5.5.2 Safety Aspects of Modern Nuclear Power Stations
    • 5.5.3 Flood Risk Management

6. CONSTRUCTION MARKET SUPPLY IN THE NUCLEAR POWER SECTOR

  • 6.1 VALUE OF THE NUCLEAR POWER SECTOR TO THE CONSTRUCTION INDUSTRY
    • 6.1.2 The Nuclear Market Supply Chain
  • 6.2 AVAILABLE CONSTRUCTION EXPERIENCE & CAPABILITY IN THE NUCLEAR POWER SECTOR
  • 6.3 KEY CONTRACTOR PROFILES
  • APPENDIX 1

TABLES AND CHARTS

  • TABLE 1 NEW NUCLEAR POWER - THE 4 CONTENDING REACTOR DESIGNS CAPACITY, DESIGN LIFE, CONSTRUCTION TIMES AND MANUFACTURERS
  • TABLE 2 NUCLEAR POWER STATIONS CURRENTLY OPERATING IN THE UK - CAPACITY AND PLANNED CLOSURE DATES
  • CHART 3 ELECTRICITY GENERATION MIX - SHARE BY FUEL TYPE 2007
  • CHART 4 DOMESTIC ELECTRICITY MARKET SHARES - MARCH 2006
  • CHART 5 GROWTH IN ESTIMATED LIFETIME COSTS OF DECOMMISSIONING NDA SITES (£BN) 2003-2007
  • CHART 6 MARKET SIZE FOR DECOMMISSIONING TO 2100 - BNFL, UKAEA AND MAGNOX SITES
  • TABLE 7 CLOSED NUCLEAR POWER STATIONS IN THE UK (CAPACITY/CLOSURE DATES)
  • CHART 8 POSSIBLE FUTURE ELECTRICITY GENERATION MIX BY FUEL TYPE 2025 (GAS, NUCLEAR, RENEWABLES, COAL, OTHERS)
  • CHART 9 EXISTING COAL FLEET DECLINE 2007 TO 2025
  • TABLE 10 CARBON EMISSIONS OF GENERATING TECHNOLOGIES - NUCLEAR, WIND, BIOMASS, NATURAL GAS, COAL AND LIGNITE
  • CHART 11 FOSSIL FUEL RESERVES-TO-PRODUCTION RATIOS (YEARS) - BY FUEL AND REGION
  • TABLE 12 ESTIMATED TIMEFRAME FOR BUILDING NEW NUCLEAR REACTORS - PHASES 1-3, 2006-2018
  • CHART 13 ROUTE TO POSSIBLE NEW NUCLEAR POWER STATIONS 2007 - 2020 (PLANNING AND CONSTRUCTION)
  • CHART 14 BREAKDOWN OF PROFESSIONAL SERVICES NEEDED FOR NUCLEAR PLANT CONSTRUCTION
  • TABLE 15 ESTIMATED CONSTRUCTION COSTS OF NUCLEAR POWER STATIONS - BREAKDOWN BY KEY ELEMENTS
  • CHART 16 COST PROFILE OF NUCLEAR POWER VS. GAS-FIRED GENERATION (%) - MIX BY CAPITAL, O&M, FUEL AND ' BACK-END' .
  • TABLE 17 IMPACT OF FUTURE EXTREME WATER LEVELS AT MAJOR NUCLEAR SITES
  • TABLE 18 MEASURES REQUIRED FOR FUTURE FLOOD DEFENCE AND COASTAL PROTECTION AT BRITISH ENERGY SITES
  • CHART 19 NUCLEAR WORK - MARKET VALUE TO THE CONSTRUCTION INDUSTRY TO 2035
  • TABLE 20 ESTIMATED MARKET OPPORTUNITIES FOR CONTRACTORS IN THE NUCLEAR INDUSTRY TO 2035
  • TABLE 21 CONSTRUCTION SUPPLY CHAIN IN THE NUCLEAR SECTOR - KEY TIERS AND PLAYERS
  • TABLE 22 NUCLEAR POWER SECTOR - GLOSSARY OF TERMS
Related Report
Back to Top
Please inform me when related publications are released
InfoWatch

US: 1-860-674-8796 EU: 32-2-535-7543 SG: 65-6223-2436
The vertical markets research portal
© 2009, the-infoshop.com by Global Information, Inc. All rights reserved.